,

Ross Asia SERPAR® 35 Series Double valve with electronic DS monitor

Made in Japan
Manufacturer : Ross Asia
Model : SERPAR® 35 Series

SERPAR ® Double Valves with D-S Monitor 35 Series Product Overview

Clutch/Brake Control Function

The SERPAR ® double valve is designed to provide control of clutch/brake mechanisms on stamping presses, and many other critical applications such as alternative lockout systems for energy isolation, as well as other Category -3 and -4 safety circuits.
The SERPAR ® Series valves are internally monitored double valves with a built-in monitoring device that checks for the proper operation of each valve element. If the internal monitor detects a valve fault on a particular cycle, the double valve will fail to a safe condition (all downstream air is exhausted) and the monitor will lock-out to inhibit further operation of the device. Normal operation can only be resumed by properly resetting the monitor.

VALVE FEATURES

Specifications

PRODUCT CREDENTIALS

Ordering Information

MODEL NUMBER CONFIGURATOR(3-Way 2-Position Valves)

Valve Schematic

Valve Operation

Conditions at Star
Inlet 1 is closed to outlet 2 by both valve elements A and B. Outlet 2 is open to exhaust 3. Contacts of switch SW are closed. Monitoring pressure signals at both ends of spool S are exhausted.
Normal Operation
Simultaneously energizing both solenoids actuates both pilots and causes valve elements A and B to shift. Inlet 1 is then connected to outlet 2 via crossflow passages C and D. Exhaust 3 is closed. Monitoring pressure signals go to pressure indicators Ia and Ib, causing the indicator pins to be extended and to actuate proximity switches SWa and SWb. In normal operation, each pair – solenoids, valve elements, indicators, and proximity switches – responds in unison so that the comparator circuits “read” the operation as normal.
Completion of Normal Cycle
Simultaneously de-energizing both solenoids returns the valve to the “Conditions at Start” described above
Detecting a Malfunction
A malfunction in the system or the valve itself could cause one valve element to be open and the other closed. Air then
flows past the inlet poppet on valve element A, into crossflow passage D, but is substantially blocked by the spool portion
of element B. The large size of the open exhaust passage past element B keeps the pressure at the outlet port below
two percent of inlet pressure. Full monitoring air pressure from side A goes to pressure indicator Ia so that its pin is
extended and actuates proximity switch SWa. When the time interval between the signal to a solenoid and the signal
from its corresponding proximity switch exceeds approximately 175 milliseconds, the D-S monitor breaks contacts Sa
and Sb as soon as solenoid power is removed. This allows valve element A to return to the closed position.
D-S Monitor Locked-out
With the valve locked out by contacts Sa and Sb, solenoids Pa and Pb cannot be energized. The monitor must be reset before another valve cycle can begin. Reset can be achieved by a separately connected ancillary switch, but not if the pilot solenoids are energized. The monitor can be reset by removing and reapplying power to the monitor even when the pilot solenoids are energized. For this reason it is necessary to have the pilot solenoids de-energized during and following reset to prevent inadvertent and possibly dangerous cycling of the press.
Dimensions-Inches(mm)
Basic Size 8
Basic Size 12
Basic Size 30

Accessories & Options

ENERGY RELEASE VERIFICATION

REPLACEMENT VALVES

CONNECTION PIPING KITS

REQUEST QUOTATION

PAYMENT

payment-methods

 

TOOLS & EQUIPMENT

Lifting
Eagle Clamp | Eagle Jack | Elephant | Endo Kogyo
Japan Clamp | Kanetec | Jung | KITO | Katsuyama Kikai
Kondotec | Miki Netsuren | Sanei Seiki | Taiyo

Hand Tools
Bix | Miyakawa | Nakatani Kikai | Ogura | Osakada Tool
Super Tool | TONE | Yutani

Tape
Kamoi | Kikusui | Misuzu | Nirei | Okamoto | Taiho | Teraoka

Measurement
Hasegawa | Kawaki | Kett | KGK | Line Seiki | Nagano Keiki
Niigata Seiki | Obishi Keiki | RSK | Ryoden Shonan | Sanko
Sanwa Supply | Showa Seisakusho | Showa Sokki
SK Sato | Tokyo Keiso | Tokyo Sokushin

Safety Tools
Fujii Denko | Shigematsu | Titan

Welding
Asahi Weldex | Daihen | Koike | Nissan Tanaka

Drilling
Dijet | Kansai Kogu | Nitto Kohki | Okazaki Seiko | Takeda

Chemical
Cemedine | DaitoNippon Grease | Taseto

Other Tools
Hammer Caster | Kitagawa | Matsuda Seiki | Misuz | Sanritsu
Sanyutec | Shizuoka Seiki | Toyo Kensetsu Kohki | Yamamoto
Yamari

PLANT FACILITIES

Facilities
Acokk | Bunkaboeki | Horiuchi | Konan | Murakoshi
Murakoshi Industries | Nesstech | Nihon Flux | Nikkin Flux
NFK | Omega System | Organo | Taiyo Parker | Toyo Mic

Pump
Dynaflo | Ebara | Honda Kiko | KyowaMusashino
Tsurumi

Valve
Astam | Kyowa Iron | Nachi | Nippon Daiya | Sawada
Wasino Kiki | Yoshitake

Electricity
Arkon | Asahi Bagnal | Gentos | Iwasaki | Kokosha | U_RD

CONSTRUCTION

Concrete Work
Daia | EXEN | Japan Life | Mikasa | Okasan Kiko | Taiheiyo

Railway Work
Kyoei | Sanwa Tekki | Teikoku | Toko

Scaffolding
Bullman | Okabe | Rikiman | Tsugaru

High Tension Bolt
Dong Ah | KPF | Nippon Steel Bolten | Nippon Fastener

Bolt & Nut & Washer
Hard Lock | Kishu Fastener | Matsukin | Mori Kozai
Nakaumi | Naniwa | Ogawa | Otani | Sudo | Toneji

STEEL MATERIAL

Steel & other Material
Dongil | JIS Standard | DSR | Sumitomo Wire | Winoa IKK

Pipe
Benkan

Return Top