This step is necessary to manually restore the PCS once power is restored to the commercial grid after a power outage. By performing this action, the system ensures a smooth transition and avoids any operational disruptions. Additionally, this process allows for immediate recovery, enabling the system to resume normal functions without delay.
MIYAKI ELECTRIC MFG.CO.
Miyaki Power Restoration Control Box

Manufacturer: MIYAKI ELECTRIC MFG.CO.,LTD.











