,

Sika SC-PU1NB Architectural Sealant 1-Component Polyurethane Type

Product Made In Japan
Manufacturer: Sika
Model: SC-PU1NB

F-25LM-8020(PU-1) model with JSIA F★★★★★
It’s a high-performance, energy-saving model that can respond to the needs of the future of sealing technology, and it’s a vacuum pump in the semiconductor industry. It’s a product that has received a five-star energy-saving rating. Please do not hesitate to contact us for any inquiries or more detailed information.

Sealing Material Properties

AppearancePaste Form
Performance based on San 8 45758Slump (01171)Vertical5°C0
50°C0
Slump (0101)Horizontal5°C0
50°C0
Elastic Recovery (%)94
AdherendAluminum
Tensile Stress [N/mm^2]23°C0.1
-20°C0.2
Adhesiveness under Fixed Elongation23°CNF
-20°CNF
Adhesiveness after Compressive Heating and Tensile CoolingNF
Adhesiveness after Artificial Light Exposure
Adhesiveness under Fixed Elongation after Water ImmersionNF
Volume Loss (%)7.4
Durability ClassificationEquivalent to 8020
Reference PropertiesShelf Life (Months)9
Extrudability (Seconds)5°C7
23°C3
Curing Speed (Days) (Full cure at 5mm thickness)SpecificationThroughout the Year
5°C7 or more
23°C2
35°C1.5
Touch Dry Time (23°C – Hours)Within 3
Density (g/cm^3)1.4
Type Tensile AdhesivenessAdherendStress & Elongation Conditions50% Tensile Stress 1X1/0117)2Maximum Tensile StressElongation at Maximum Load (%)
AluminumAfter Curing23°C0.141.201.000
After Heating23°C0.121.00980
After Water Immersion23°C0.100.80750
MortarAfter Curing23°C0.140.80850
After Heating23°C0.120.82760
After Water Immersion23°C0.100.72740

A test result of “1” indicates that the product is not tested, and “NF” indicates that there is no damage.
The H-type tensile adhesion test is conducted in accordance with JIS A1439. The heating temperature “after heating” is the compression heating temperature of the durability test, and is 80℃ for products without durability classification. The results are representative values.

List of Suitable Materials for Appropriate Use

Working JointsCurtain WallMetal Curtain WallMullion MethodGlass Perimeter Joint
Mullion-less Joint
Panel MethodPanel Interval Joint
Glass Perimeter Joint
PO Curtain WallStone Pre-attachment, Tile Pre-attachment, Painting & Spraying「。バネル同目地
Window Frame Perimeter Joint
Glass Perimeter Joint
Various Exterior PanelsPanel (Vertical Wall Locking, Horizontal Wall Anchor Method)パネル間目地 Window Frame Perimeter Joint Joint with ClearanceWith Painting
Without Painting
Painted Aluminum PanelForced Drying, Applied Paintingバネル間目地
Painted Steel PlateForced Drying, Baked Paintingバネル間目地
Window Frame Perimeter Joint
Enamel Steel Plateバネル間目地
Window Frame Perimeter Joint
6^(3、Extruded Cement Board Joint Markバネル間目地 Window Frame Perimeter JointWith Painting
Without Painting
Metal Insulated Sandwich Panelバネル問目地
ガラスSingle WindowGlass Perimeter Joint
Continuous WindowsGlass Perimeter Joint
Glass Butt JointGlass Perimeter Joint
Metal Manufactured Ratio AFixture PerimeterDrainage-Dish Plate Joint
Fixture Interval Joint
Factory SealSealing Material Receiver
CapMetal Cap笠木間目地
Stone Cap笠木間目地
笠木笠木間目地
Concrete WallStructural SlitStructural Slit JointWith Painting
Without Painting
Non-Working JointFestival Wall, Star Style/Struck Joint + Crack Induced Joint Window Frame Perimeter JointWith Painting
Without Painting
Wet Stone Paving Including Stone JointStone Joint (Excluding Marble)
Marble Joint
Window Frame Perimeter Joint
Tile BackingTile Joint
Tile Undercarriage Joint
Window Frame Perimeter Joint
Public ExteriorTwo Types of Panelバネル間目地With Painting
Without Painting
Various joints other than exterior wallsRooftopSheet Waterproofing and Other Final Processing
FloorConcreteSlit Joint
Stone Paving & Tile PavingStone & Tile Joint
Panel and Raised Floor Panel IncludedSame Panel Joint
Water AreaBathroom & Bathtub
Kitchen Cabinet & Sink
Washbasin Perimeter
Drainage Outlet Perimeter & Through Pipe PerimeterWith Painting0
Without Painting
Column Base Perimeter etc.With Painting0
Without Painting
Inner Wall (Partition) Joint
Painting Completed Waterproof Material Base Treatment
PrimerN0.40
Type1 – Urethane-based
Formaldehyde Emission GradeNot specified
AppearanceLight yellow transparent
Main ComponentsSynthetic rubber, synthetic resin, silane coupling agent
Drying Time (minutes)5960 or more
20*030 or more
35915 or more
Effective Time After Application (hours)8
Effective Time After Opening (days)Within the same day
Shelf Life (months)6
Solvent ContentEthyl acetate, butyl acetate
Main Usable SubstratesAluminum, concrete

※Notes:

●When installing the primer, be careful not to protrude or fly. Once completely cured, the primer will firmly adhere to the substrate and will not dissolve in organic solvents.
Please wipe it clean with a cloth soaked in toluene etc. as soon as possible on the day of construction. Please be aware that if you scrape or otherwise remove the adhesive after it has hardened, you may damage the underlying surface during removal.

Construction Procedure

1 Meeting before construction

Thoroughly consider the fit of the joints (shape and dimensions, secondary drainage treatment, construction conditions, etc.).

2 Preparation before construction

Please select materials, primers, auxiliary materials, and prepare construction instructions.

3.Inspection before construction

Please check the construction location, joint shape, dimensions and level differences.
Check for defects on the adherend (jumpers, chips, cracks, etc.) and repair as necessary.

4 Cleaning and drying the base

Check whether the adherend is sufficiently dry.
To prevent adhesion failure due to oil, dirt, dust, etc., carefully clean the surface to be adhered by wiping it dry and then wiping it with a clean cloth soaked in solvent.
Choose a cleaning solvent that can sufficiently remove oil, dirt, and other factors that inhibit adhesion from the adherend (such as methylcyclohexane). Please use n-hexane to dissolve the painted surface.

5 Loading backup material

Load backup material appropriate for the joint dimensions.
If there is not enough room for the depth of the joint, attach a bond breaker to the bottom to ensure two-sided adhesion. (For working joints)

6 Paste masking tape

Please be careful not to let the tape dig into the surface to which it is attached.
No adhesive remains, and the solvent used in the primer does not have a negative effect on adhesion. Use masking tape.

7 Primer application

Apply evenly with a brush to avoid uneven application.
Be careful when applying the primer so that it does not scatter or protrude.
Please ensure the specified drying time and fill the sealant within the effective time after application.

8 Filling with sealant

Consider the nozzle angle and filling speed so that sufficient pressure can be applied to the adherend using a nozzle that matches the width of the joint, and that it can fill to the bottom of the joint. 3 Inspection before construction

9 Spatula finish

After filling the sealant, finish it immediately with a spatula.
When finishing with a spatula, apply sufficient pressure to create a smooth finish.

10 Masking tape removal

The masking tape adhesive may transfer to the adherend, so please remove the masking tape immediately after filling.

11. Cleaning around the joints

12. Curing of sealant

13. Comprehensive inspection

*During construction, performance cannot be achieved unless materials are used appropriately. Please follow the construction procedures, etc. when handling.

Handling Precautions

This describes product performance under appropriate conditions and assuming proper storage, handling, and use. It merely describes general construction methods and procedures. The selection, storage, treatment and use of products, construction methods and procedures, etc. under the relevant construction conditions in individual and specific construction work are the responsibility of the construction contractor, who is an expert user.

Handling work

1 Wear protective gloves and an apron while handling.
2 When working in a closed room, ensure adequate ventilation.
3. Wear safety glasses, protective masks, etc. depending on the work situation.
4. Wash your hands and gargle thoroughly after handling.
5 Avoid direct skin contact.
6 Avoid contact with eyes.
7 Do not breathe vapor.
8 Do not swallow.
9 Please strictly refrain from smoking while using Hamatite.
10 Please cure without touching until hardened.
11 Please entrust waste disposal to an industrial waste disposal company.

First Aid

1 If it gets on your skin, immediately wipe it off with a rag and wash thoroughly with plenty of water and soap.
2 If itching or inflammation develops, consult a doctor immediately.
3 In case of contact with eyes, rinse thoroughly with clean water and consult an ophthalmologist immediately.
4 If you feel unwell after inhaling the vapor, immediately move to a place with fresh air.
5 If you experience any abnormalities such as a headache, please consult a doctor immediately.
6 If swallowed, drink plenty of water or milk, induce vomiting, and seek medical advice immediately.

Handling location

1 Never use the product near fire.
2. Install a local exhaust system in the handling area.
3 Keep out of reach of children.

Storage

1 Store tightly closed and indoors, away from direct sunlight, fire, moisture, and water.
2. Please use within the expiration date.
3 Please use up immediately after opening.

Prohibition Of Use For Other Purposes

This product is developed for architectural use. Please do not use it for any purpose other than this purpose. *Some of the Hamatite products listed in this catalog are toxic and flammable. Please refer to the Safety Data Sheet (SDS) for detailed information.

Note : Sika provides this information in good faith, based on current knowledge and experience, regarding the installation and use of our products. It assumes that products are stored, handled, and installed properly under normal conditions following Sika’s recommendations. This applies only to products intended for specific construction conditions mentioned in this document. If application conditions change, such as substrate alterations, or for different uses, please consult Sika’s Technical Service Department before using the product. Users should verify the product’s intended use or purpose.

REQUEST QUOTATION

PAYMENT

payment-methods

Return Top