,

Okabe C20-0110 Pile Head Cover

Product Made in Japan
Manufacturer: Okabe
Model: C20-0110

Prevention cover for concrete infiltration on pile head

ProductConcrete pile usedQuantity (pc/case)
Outside diameterInside diameter
P25025015030
P30030018030
P350350220~23030
P400400250~26030
P450450290~30030
P500500320~34030
P60060040015

 

Hanging legQuantity (pc/case)
L 20030
L 30030
L 40030
L 50030
L 60030
L 70015
L 80015
L 90015
L 100015
L 110015
L 120015

* Other sizes are made to order.
* The legs fit any cover.

Features

● Installation is easy with three hanging legs

Cautions

● Do not apply ready-mixed concrete directly to the cover with concrete pump.
● When the placing height (h) from the concrete pouring position to the cover is 2m or more, or the chipped surface of the pile and the hanging legs are not engaged sufficiently, provide the following reinforcing measures.
● Before placing leveling concrete, place ready mixed concrete approximately 100 mm~150 mm in thickness from the bottom of the cover, and cure it for two to three days.
● Bind the main reinforcement of the pile and the hanging legs with tie wire, etc.

REQUEST QUOTATION

PAYMENT

payment-methods

Return Top